- Welcome to City Engineer’s Office!
Project Implementation Services
CEO-PD-PR-01- Provision of DAED
CEO-PD-PR-02 Preparation of Site Investigation Report
CEO-PD-PR-03 Processing of Request Letter
CEO-PD-PR-04 RROW Certification
CEO-PD-PR-05 RROW Relocation Request
CEO-CD-PR-01 Start of Project Implementation
CEO-CD-PR-02-Issuance of Pouring Permit
CEO-CD-PR-03-Issuance of Advance Payment
CEO-CD-PR-04-Issuance of Progress Payment
CEO-CD-PR-05 Issuance of Final Payment
CEO-MQC-PR-01 LABORATORY TESTS
Operation Support Services
Project Implementation Services
CEO-PD-WIN-01 DAED DED Preparation
CEO-PD-WIN-02 Preparation of Site Investigation Report
CEO-PD-WIN-04 RROW certification
CEO-PD-WIN-05 RROW Relocation Survey
CEO-CD-WIN-01-Start of Project Implementation
CEO-CD-WIN-02-Issuance of Pouring Permit
CEO-CD-WIN-03-Issuance of Advance Payment
CEO-CD-WIN-04-Issuance of Progress Payment
CEO-CD-WIN-05-Issuance of Final Payment
CEO-MQC-WIN-01 LABORATORY (104, 105, 201)
CEO-MQC-WIN-02 LABORATORY (AGGREGATES)
CEO-MQC-WIN-03 LABORATORY COMPRESSIVE TEST
CEO-MQC-WIN-04 LABORATORY FLEXURAL TEST
Operation Support Services
CEO-MD-WIN-01 Repair and Services
CEO-MP-WIN-01 Pre-repair-Inspection
Project Implementation Services
CEO-PD-GL-01 DAED DED Preparation
CEO-PD-GL-02 Site Investigation Report
CEO-PD-GL-04 RROW Certification
CEO-PD-GL-05 RROW Relocation Survey
CEO-CD-GL-01-Start of Project Implementation
CEO-CD-GL-02-Issuance of Pouring Permit
CEO-CD-GL-03-Issuance of Advance Payment
CEO-CD-GL-04-Isuance of Progress Payment
CEO-CD-GL-05-Issuance of Final Payment
Operation Support Services
CEO-MD-GL-01 Repair and Services
CEO-MP-GL-01 Pre-repair-Inspection
CEO-MP-GL-02 Fair-Market-Value
CEO-ADM-QPD-03 Department Plan
CEO-ADM-QPD-05 DP-OPCR-ACCOMPLISHMENT
CEO-ADM-QPD-01 (2023) First Quarter Accomplishment
CEO-ADM-QPD-02 (2023) Second Quarter Accomplishment
CEO-ADM-QPD-03 (2023) Third Quarter Accomplishment
CEO-ADM-QPD-04 (2023) DPMT Resolution No. 1 2022 (IPCR and OPCR rating)
CEO-ADM-QPD-05 (2023) DPMT Resolution No. 1 (IPCR and OPCR rating)
CEO-ADM-QPD-06 (2023) DPMT Resolution No. 2 (IPCR and OPCR rating)
CEO-ADM-QPD-07 (2023) DP-OPCR-IPCR-2023-updated-as-of-June-13
DILG-Memo_Circular-2011413-65dc31c35e
DO_143_s2017_REVISED STANDARD ITEMS FOR INFRA
Fire-Code-of-the-Philippines-2008-IRR (1)
GUIDELINES FOR PROCUMENT OF INFRA PROJEC PD ACT 9184
OVERVIEW OF BP 344 VIS-A-VIS PD 1096 (WITH PENAL PROVISIONS)
table of contents specs vol. II, 2004
DILG-Memo_Circular-2011413-65dc31c35e
DO_143_s2017_REVISED STANDARD ITEMS FOR INFRA
Fire-Code-of-the-Philippines-2008-IRR (1)
GUIDELINES FOR PROCUMENT OF INFRA PROJEC PD ACT 9184
OVERVIEW OF BP 344 VIS-A-VIS PD 1096 (WITH PENAL PROVISIONS)
table of contents specs vol. II, 2004
Updated-2016-IRR_31-March-2021
PMS 2023
Project Implementation
CERTIFICATE OF QUALITY ASSURANCE
COMPLETE TEST FOR DEFORMED BARS
REPORT ON COMPRESSIVE STRENGTH OF CONCRETE CYLINDER SAMPLE
REPORT ON COMPRESSIVE STRENGTH OF CONCRETE HOLLOW BLOCK SAMPLE
REPORT ON FLEXURAL STRENGTH OF CONCRETE BEAM SAMPLE
WORKSHEET FOR DESIGN OF CONCRETE MIX
WORKSHEET FOR FIELD DENSITY TEST
WORKSHEET FOR TEST OF SOIL MOISTURE-DENSITY RELATION
Operation Support Services
CEO-ADM-FORMS-01-Fuel Tank Consumption Report
CEO-ADM-FORMS-02-Gate Pass Form
CEO-ADM-FORMS-03-Individual Fuel Consumption Form
CEO-ADM-FORMS-04-Requisition and Issue Voucher
CEO-ADM-FORMS-05-Summary Statement of Fuel Consumption
CEO-MP-FORMS-01-Accomplishment
CEO-MP-FORMS-03-Fair Market Value Certification
CEO-MP-FORMS-04-Job Order Form
CEO-MP-FORMS-05-Pre-repair Inspection Certification
Project Implementation Services
CEO-PD-REC-01 SURVEY EQUIPMENT CALIBRATION PROGRAM
CEO-CON-REC-02 Project Record Book
CEO-CON-REC-03 Pouring Permit Logbook
CEO-CON-REC-04 Pouring Permit Logged
CEO-MQC-REC-01 Certificate of Quality Control Assurance
CEO-MQC-REC-02 LIST OF MACHINERIES, EQUIPMENTS ACCESSORIES
CEO-MQC-REC-03 MQCD CALIBRATION PROGRAM
BENDING TENSILE TEST RESULT SAMPLE
COMPRESSIVE RESULT TO RHT SAMPLE (CONCRETE CYLINDER SAMPLE)
QUARTERLY CERTIFICATE OF QUALITY CONTROL ASSURANCE
TESTING RESULTS FOR ROAD CONC AT FATALDAO TO BLAGAN SAN JOSE, GSC2(FLEXURAL TEST)
Operation Support Services
CEO-MD-REC-01 Maintenance Program of Roads and Bridges
CEO-MD-REC-03 Starlight Inventory
CEO-MD-REC-04 Starlight Inventory 2
CEO-MD-REC-05 Electrical Maintenance Program
CEO-MP-REC-02 PERIODIC MAINTENANCE WORK SCHEDULE
CEO-MP-REC-04 WORK INSTRUCTION FOR CORRECTIVE MAINTENANCE
CEO-ADM-REC- 01 Minutes of the Meeting IPCR 1st sem 2022
CEO-ADM-REC- 02 Minutes of the Meeting January 2022
CEO-ADM-REC- 03 Minutes of the Meeting February 2022
CEO-ADM-REC- 04 Minutes of the Meeting March 2022
CEO-ADM-REC- 05 Minutes of the Meeting April 2022
CEO-ADM-REC- 06 Minutes of the Meeting May 2022
CEO-ADM-REC- 07 Minutes of the Meeting June 2022
CEO-ADM-REC-09 Internal Memorandum
CEO-ADM-REC-10 Customer Satisfaction Rating (April-June 2022)
CEO-ADM-REC-08 Customer Satisfaction Rating (March-June 2022)
CEO-ADM-REC-11 ITC PREVENTIVE-MAINTENANCE PLAN
CEO-ADM-REC- 01 Minutes of the Meeting January 2023
CEO-ADM-REC- 02 Minutes of the Meeting January 2023
CEO-ADM-REC- 03 Minutes of the Meeting March 2023
CEO-ADM-REC- 04-April 2023 minutes of the meeting
CEO-ADM-REC-05-May 2023 minutes of the meeting
CEO-ADM-REC-06-June 2023 minutes of the meeting
CEO-ADM-REC-07-July 2023 minutes of the meeting
CEO-ADM-REC-08-August 2023 minutes of the meeting
CEO-ADM-REC-09-September 2023 minutes of the meeting
CEO-ADM-REC-10-October 2023 minutes of the meeting
CEO-MD-REC- 01 (2023) CAR

MANDATE
Pursuant to RA 7160, Local Government Code of 1991, the Office of the City Engineer is mandated to;
- Initiate, review and recommend changes in policies and objectives, plans and programs, techniques, procedures and practices in infrastructure development and public works;
- Advise the Chief Executive on infrastructure, public works and other engineering matters;
- Administer, coordinate, supervise and control the construction, maintenance, improvement, and repair of roads, bridges, and other engineering and public work projects; and
- Provide engineering services to the local government including investigation and survey, engineering designs, feasibility studies, and project management.
VISION
The Office of the City Engineer is a model department in the implementation and management of world-class and resilient infrastructure through optimum use of state-of-the-art technology and facilities.
MISSION
To effectively and efficiently develop, implement and maintain infrastructures, advice the Chief Executive on engineering matters and provide engineering services to the departments of the local government
CITY QUALITY POLICY

We, the Local Government of General Santos City, aspire to be globally competitive while enhancing the quality of life of our citizen towards a sustainable future.
We are committed to providing quality services to all members of our society.
We shall continually strive to improve our city, our people, and our services, while we foster the rule of law and equal opportunity for all.
CEO PERSPECTIVE
